• Rapid deployment – 8 times faster than traditional field termination.
• No waste will be left at the customer's site. The factory prefabricated solution makes the installation cleaner, requires less cleaning work, and the installation effect is more beautiful.
• Standard labor costs plus the cost of materials for traditional construction reduce the customer's total cost of ownership (TCO).
• Make installation easier for data center personnel/installers.
• Built in reliability assurance.
• It can be expanded completely according to customer needs. In terms of infrastructure, the time to achieve growth is far shorter than in the past. The survey, planning and installation time has been greatly reduced.
• InstaPATCH Cu pre terminated copper solution can be customized and built completely according to your exact needs.
• From the installation point of view, the use of InstaPATCH Cu solution simplifies and accelerates the deployment process, bringing economic benefits to all aspects concerned.
• The time between ordering and delivery is short, and it is easy to meet the requirements of critical installation period.