Hello, welcome to visit Wuxi Security Monitoring, Wuxi Monitoring, Wuxi Remote Monitoring, and the official website of Wuxi Dehang Technology Co., Ltd!

 1512008412106430.png   Service hotline 138-618-32237

 Wuxi Monitoring

technical support

Product classification

contact us

Enterprise name: Wuxi Dehang Technology Co., Ltd

Contact: Mr. Liu

Tel.: 0510-68289990

Mobile: 13861832237

Email: [email protected]

Website: nabenjixie.cn

Address: Room 1202, No. 99 Zhaoshangcheng Road, Wuxi, Jiangsu

Welcome to Wuxi Security Monitoring, Wuxi Monitoring, Wuxi Remote Monitoring - the official website of Wuxi Dehang Technology Co., Ltd!

Comprehensive wiring construction process of security monitoring project

Comprehensive wiring construction process of security monitoring project

Date of issue: 2023-02-06 Author: Click:

Security monitoring Construction process of engineering generic cabling


Comprehensive wiring construction process of security monitoring project



Comprehensive wiring construction process of weak current system.



The weak current integrated system may be known to many people, but we know how to construct the wiring of the weak current integrated system? Next, I will introduce the knowledge of wiring construction of weak current integrated system.



1. Security monitoring conducts site survey:



Including routing, we should consider the shielding of the weak point integrated system wiring, and bypass the power lines and other lines while using the site space for building damage.



2. Security monitoring planning design and budget:



The route shall be identified according to the above and an application shall be submitted for approval. In case of the need to drill holes through the wall above the bearing beam, the application shall be submitted to the relevant departments in a timely manner. In case of illegal construction, the description of all planning and damage losses shall be approved by Party A and the management unit as appropriate, and the planning shall be modified, On the basis of the formal construction and the plan approved by the relevant departments, the budget for the materials and labor to be used should be made, and the budget and construction time should be proposed after comprehensive consideration of the costs incurred in the actual construction process of the design.



At the same time, the construction scheme and plan should also be considered. Whether the user is willing to cooperate shall also be considered when the scheme construction is actually carried out. The implementation scheme shall also be discussed with the user side to obtain its approval and signature, and at the same time, the responsible staff for coordination, the project leader, the project supervisor and other personnel shall be arranged to plan and prepare materials, prepare work and coordinate with the user, and coordinate internal and external coordination and management in the construction process.


 Security monitoring

Website: //nabenjixie.cn/news/589.html

key word: Security monitoring , monitor , Remote monitoring

Recent browsing:

  • Online Service
  • contact number
    thirteen billion eight hundred and sixty-one million eight hundred and thirty-two thousand two hundred and thirty-seven
  • Online Message
  • Mobile website
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address